Fotovol

Solar panels in Ilfov county — companies and installers

20 solar installer companiessee 299 electricians

Localities covered in Ilfov county

The listed companies cover the entire county, including:

  • Bragadiru
  • Buftea
  • Chitila
  • Magurele
  • Otopeni
  • Pantelimon
  • Popesti-Leordeni
  • Voluntari
  • 1 Decembrie
  • Afumati
  • Balotesti
  • Berceni
  • Branesti
  • Cernica
  • Chiajna
  • Ciolpani
  • Ciorogarla
  • Clinceni
  • Copaceni
  • Corbeanca
  • Cornetu
  • Darasti-Ilfov
  • Dascalu
  • Dobroesti
  • Domnesti
  • Dragomiresti-Vale
  • Ganeasa
  • Glina
  • Gradistea
  • Gruiu
  • Jilava
  • Moara Vlasiei
  • Mogosoaia
  • Nuci
  • Peris
  • Petrachioaia
  • Snagov
  • Stefanestii de Jos
  • Tunari
  • Vidra
  • Catelu
  • Cretesti
  • Darvari
  • Dudu
  • Gagu
  • Ghermanesti
  • Olteni
  • Ostratu
  • Pasarea
  • Pruni

About solar in Ilfov county

Solar panels in Ilfov county

Voluntari, Otopeni, Bragadiru, Pipera-Tunari, Domnești, Popești-Leordeni — Bucharest's bedroom communities concentrate most of Ilfov's population. The majority of houses were built after 2005 with standardised roofing (corrugated metal or concrete tile), typically three-phase service, and predictable orientation. This makes Ilfov the fastest county for PV deployment — a typical project closes from quote to grid-tied operation in 4–8 weeks, half the national average. The grid operator is E-Distribuție Muntenia. Average irradiation: 1,250 kWh/kWp/year, same as Bucharest.

Same installers as Bucharest

Fotovol lists 20 AFM Casa Verde-certified installers and 299 ANRE-licensed electricians covering Ilfov. Effectively all Bucharest installers serve Ilfov at no extra cost — the markets fully overlap. Get 3–4 quotes for real choice. See the guide.

Realistic yield

A 5 kWp residential system produces 5,500–6,300 kWh/year. For 4,500–5,500 kWh/year consumption, the system delivers surplus exported to the grid under prosumer status. Use the calculator.

Three-phase by default = direct 8–10 kWp

New residential developments (Pipera-Tunari, north Voluntari, Greenfield-Băneasa, Domnești-Tineretului) ship with three-phase service, lifting the system ceiling to 8–10 kWp without upgrade. For a house with heat pump + EV + AC, you can order the larger system directly without preliminary operator paperwork. Older houses in Bragadiru or western Pantelimon sometimes still run 6 kVA single-phase and require an upgrade first.

Solar's first steps in Ilfov county

How Ilfov PV evolved

Ilfov was among the first zones where residential PV scaled — the density of newer above-average-income homes created a natural market as early as 2017–2018, even before Casa Verde. Many PV systems went in without subsidy, fully owner-funded, with the investment justified on home value-added rather than just energy payback.

Casa Verde and volume effects

Ilfov's AFM list overlaps fully with Bucharest's — over 50 certified firms operate in the area. Volume drives average pricing on a 5 kWp system 5–10% below smaller-market counties. See the Casa Verde guide.

What is specific to Ilfov: speed

For a typical project in Voluntari or Otopeni, the timeline is: week 1 signed quote, weeks 2–3 physical install, weeks 4–6 documentation and E-Distribuție Muntenia technical approval, weeks 7–8 bidirectional meter swap and prosumer activation. Total 4–8 weeks. In Maramureș or Suceava, the same project takes 12–16 weeks due to travel and slower local bureaucracy. This is not just convenience — it is also economics: 8 weeks of lost production typically costs 600–900 kWh.

Practical decisions

In Ilfov, schedule for a March–April install to catch the full season. If you have a heat pump or EV, size for 8 kWp+ — your three-phase service supports it. Browse installers.

Are you the owner of a listed company?

Claim it for free to update contact info and description.

Find your company →
Get a free quote